Brooks Range Petroleum
Surveying Service Support for the Mustang Pad Pipeline Tie-In

In 2019 Frontier Surveys assisted Brooks Range Petroleum with their Mustang Pad Tie-In Project. This project involved setting pre-fabricated modules & pipeline spools, utility and infrastructure work, Alpine DOT sales line Tie-In, VSM pile setting & associated as-builts.

  • 1-Mile ice road to facility pipeline construction work from Mustang Pad to Alpine DOT Sales Line Tie-In
  • VSM Pile construction staking & As-builts
  • Utility Staking & As-builts
  • Aerial Drone Imagery/Mapping
  • Setting pre-fabricated Modules & Pipeline spools on the VSM’s